Air curtain controls and electrical fields
Use the worksheet and datasheet guide to carry voltage, controls, heating, wiring, access, and document needs into the request.
| Item | Project detail to collect | Model document check |
| Voltage and phase | Available voltage, phase, frequency, circuit location | Confirm exact model voltage and phase |
| Power and heating | Heated or unheated preference, circuit capacity, duty expectation | Confirm power input and heating type by model |
| Start and stop control | Wall switch, remote, door switch, sensor, timer, or continuous operation | Confirm included controls and control wiring |
| Door interlock | Door contact, access control, alarm, or building-management signal | Confirm interface and wiring requirements |
| Service and cleaning | Disconnect location, access panel, cleaning frequency, service side | Confirm installation and maintenance information |
to send with a controls question
| Attachment | Useful detail |
| Opening photos | Finished opening, header, ceiling, unit location, door operation |
| Electrical photos | Power point, disconnect, control location, wiring route, door contact |
| Existing equipment | Model label, control, heating, wiring, and visible condition |
| Project facts | Quantity, destination, application, required documents, and timing |